Working file P6

PAS 2035 risk paths A, B and C

PAS 2035 risk paths A, B and C: working anatomy of the fee line, deliverables, when mandatory.

Path tiers

ASHPMVHRU 0.18 W/m²KU 0.15 roofU 0.18 wallU 0.22 floorPath A, EPC D plus, post-1919, no protected featuresASHPMVHRU 0.18 W/m²KU 0.15 roofU 0.18 wallU 0.22 floorPath B, pre-1919 or below EPC D, or two-plus measuresASHPMVHRU 0.18 W/m²KU 0.15 roofU 0.18 wallU 0.22 floorPath C, traditional construction, listed, system-built

Fee uplift by path

DescriptionQtyUnitUnit priceTotal
Path A: Coordinator-only1project£1,500 to £2,200£1,500 to £2,200
Path B: Coordinator plus Designer1project£2,300 to £4,500£2,300 to £4,500
Path C: Coordinator plus Designer plus extended surveys1project£3,500 to £8,000£3,500 to £8,000
Surveyed 1 October 2026. Ofgem cap for 1 October to 31 December 2026 applied (gas 7.97p, elec 26.32p, gas standing 29.68p, elec standing 54.83p). Next scheduled review 25 November 2026 (January cap announcement). [ref P6]
By Oliver Wakefield-Smith, Founder, Digital Signet. Corrections to oliver at digitalsignet dot com.