Direct answer
No. The Boiler Upgrade Scheme requires MCS certification on the installer, but does not currently mandate PAS 2035 framework engagement for a standalone heat-pump install. PAS 2035 becomes mandatory the moment another publicly funded measure (ECO4, GBIS, SHDF, HUG, Warm Homes Plan) is layered onto the same project.
Further questions
- What conditions actually apply for BUS?
- Owner-occupier or private rented property in England and Wales; an MCS-certified installer; a fossil-fuel system being replaced. Since the 28 April 2026 amendment there is no EPC precondition and no insulation-recommendation barrier; where no EPC exists the installer evidences the current fuel another way (utility bill plus photos of the existing system).
- When does PAS 2035 become mandatory?
- ECO4, GBIS, Social Housing Decarbonisation Fund, Home Upgrade Grant, and the forthcoming Warm Homes Plan all require PAS 2035 framework engagement (Assessor, Coordinator, MTIP, post-install monitoring). Any project pulling on those grants must follow the framework.
- What does that mean for cost?
- An installer-led BUS-only project saves £2,500 to £6,000 in PAS 2035 process fees but transfers the design and sequencing risk to the homeowner. A PAS 2035 project carries the process fee but transfers the same risk to a TrustMark-lodged Coordinator.
Surveyed 1 October 2026. Ofgem cap for 1 October to 31 December 2026 applied (gas 7.97p, elec 26.32p, gas standing 29.68p, elec standing 54.83p). Next scheduled review 25 November 2026 (January cap announcement). [ref Q4]
By Oliver Wakefield-Smith, Founder, Digital Signet. Corrections to oliver at digitalsignet dot com.