Post-2000 new-build retrofit cost (UK 2026)
Post-2000 new-build retrofit cost: working capex envelope, sequenced measure cost, PAS 2035 risk path.
Working envelope (100 m² post-2000 build)
Scope is narrow. Typical capex: £11,000to£25,000(pre-grant). Net after BUS: £3,500to£17,500. The case for fabric work is usually limited; PV plus battery plus HP is the modal stack.
Sequenced cost
- ASHP plus rads £8,000 to £14,000 net of BUS.
- Solar PV 4 kWp £5,800 to £8,800.
- Battery 5 kWh £3,500 to £5,250.
- MVHR retrofit possible in well-built post-2010 stock.
Risk path
Path A, post-2000 build
Surveyed 22 June 2026. Ofgem Q3 2026 cap applied (gas 7.33p, elec 26.11p, gas standing 29.04p). Next scheduled review 26 September 2026 (Q4 cap publication). [ref A4]
By Oliver Wakefield-Smith, Founder, Digital Signet. Corrections to oliver at digitalsignet dot com.