Working file V8

Aira vs E.ON Next heat pump (UK 2026)

Aira vs E.ON Next heat pump (UK 2026): published prices side by side, grant treatment, warranty length and a surveyor's note on which suits which household.

Direct answer: Aira vs E.ON Next

On the published figures E.ON Next carries the lower headline. E.ON Next now publishes a fixed post-grant price from £4,946 for a typical 2-bed (Worcester Bosch Compress 2000 AWF, net after the £7,500 Boiler Upgrade Scheme grant; £4,746 for existing E.ON Next customers), with the Vaillant aroTHERM Plus at £6,019 (£5,819 existing), each confirmed after an online quote and home survey. Aira keeps the firm heat pump capital cost quote-only but publishes an illustrative example of £6,729 after the £7,500 grant for a 6kW system, plus an All-Inclusive service plan at £19.90 / month for 15 years with the first year free, covering a 15-year guarantee and servicing. The two are not a like-for-like comparison: E.ON Next's figure is a named model for a typical 2-bed, Aira's is a single worked example. Choose E.ON Next for the lower published capex and the multi-part manufacturer and performance cover; choose Aira where the 15-year guarantee and fixed servicing outweigh a lower headline price.

DimensionE.ON NextAira UK
Pricing modelFixed post-grant price published per model for a typical 2-bed; confirmed after an online quote and surveyHeat pump quote-only (outright or financed) + All-Inclusive service plan on a published monthly rate
Published anchorFrom £4,946 net after £7,500 BUS (Worcester Bosch Compress 2000 AWF, typical 2-bed; £4,746 existing customers). Vaillant aroTHERM Plus £6,019 (£5,819 existing)Illustrative example £6,729 net after £7,500 BUS (6kW system, Aira's own stated config); firm capital cost otherwise quote-only. All-Inclusive plan £19.90 / month for 15 years (first year free); guarantee + servicing
Warranty7-year product, 2-year workmanship, 5-year performance guarantee (HIES-backed)15 years on All-Inclusive
Grant handlingManages the £7,500 BUS grant paperworkManages the £7,500 BUS grant paperwork
Bundling£200 discount for existing E.ON Next customers (code PUMP200)All-Inclusive servicing subscription; no in-house energy tariff bundle

Surveyor's note (clearly opinion)

E.ON Next is the transparent headline: a named model at a fixed post-grant price for a typical 2-bed, with a layered manufacturer, workmanship and performance warranty. Aira is the subscription play, trading a higher published example price for a single 15-year guarantee and fixed servicing. Both are MCS-certified and both apply the £7,500 grant, so the real decision is warranty shape and whether you prefer a lower capex today or a longer fixed-cover commitment. As ever, the survey quote is what binds, not the headline.

See also

Surveyed 1 October 2026. Ofgem cap for 1 October to 31 December 2026 applied (gas 7.97p, elec 26.32p, gas standing 29.68p, elec standing 54.83p). Next scheduled review 25 November 2026 (January cap announcement). [ref V8]
By Oliver Wakefield-Smith, Founder, Digital Signet. Corrections to oliver at digitalsignet dot com.